1: Preparation for weak current construction in the early stage
The preliminary preparation for weak current construction is very important, which directly determines the later construction period. It mainly includes: first, an overall understanding of the construction plan, on-site investigation based on drawings, quantification of personnel for each type of work, preparation of weak current equipment and construction materials, on-site coordination with Party A, and handling of personnel entry and exit documents.
2: Installation and construction phase work after entering the site
Mobilization of equipment, materials, personnel, custody of equipment and materials by the other party, on-site safety briefing.
3: Post installation testing of equipment
According to the requirements of the on-site party A and the plan, all weak current equipment on site shall be tested, and photos shall be taken and documented to ensure that the later acceptance is qualified and well documented.
4: Acceptance process
Firstly, conduct on-site verification according to the acceptance standards in advance, rectify any non-conforming items, and prepare acceptance documents in advance.